DRO Start and Reserve - Terminology and reconciliation
DRO Start and Reserve / Grey
MJ Physics Engineering | Bangel Language | MJos Operating System
Owned and operated by Michael Bangel | Clearwater, Florida
CANONICAL PROJECT NAME
DRO Start and Reserve
DEFINITION
Represent source, start-energy, restart-reserve, conversion, and permit gates without authorizing ignition hardware.
RELATIONSHIP
Product profile within MJ; status from the original product register is retained.
CURRENT FAMILY TERMINOLOGY
MJ Physics Engineering: company identity.
Bangel Language: language identity.
Elsa: the compiler.
JP: the explicitly versioned representation; protocol and profile remain distinct.
Joanna: runtime, processing and execution evidence.
MJos Operating System: operating-system identity; the name does not establish a bootable implementation.
MJos Predictive Model: separately identified predictive model; forecasts remain distinct from observations and authority.
MJ: governing context and bounded permission where an applicable profile supplies it.
PROJECT TYPES
- EnergySource: classified reference
- StartEnergy: amount or UNKNOWN
- RestartReserve: protected bound
- OperationState: non-operational hold
EQUIVALENCE RULE
Related names aid discovery. They do not merge capability, mathematical meaning, evidence state or permission boundaries.
DISCOVERY NAMES
DRO-IGNITION-REFERENCE-001; DRO Start-Energy and Restart-Reserve Reference System
These names aid search; current compiler naming remains Elsa.
SOURCE STATUS AND LIMITS
Historical reference or specification recovered. Its source status remains visible and is not promoted to a current standalone implementation.
Recovered status: documented_non_operational_reference_active_hold.
NON_OPERATIONAL_REFERENCE_ACTIVE_HOLD
SOURCE REFERENCES
- Recovered nonwhite collection, page 1407
https://drive.google.com/file/d/1RpxuVZjdCHSITNXIZZuWacJ1BNBAPCLv/view#page=1407