MJos Predictive Model | First manifestation of the Bangel Language

MJ Physics Engineering | Owned and operated by Michael Bangel | Clearwater, Florida

TR-PINK-F-153 / Teal / Review draft

Predicted bus voltage

Terminology revised ยท September 12 evidence

Later individual Teal rerun. The reported execution status is historical and is not a new test result.

TEAL LIBRARY RERUN  |  12 SEPTEMBER 2026  |  Michael Patrick Bangel
174
TEAL-RERUN-02-B007 | SCOPED_EXECUTION_VERIFIED
TR-PINK-F-153 / Predicted bus voltage
IF
Invoke F-153 with exactly these inputs: voltage: Real, horizon: Real, voltage_rate: Real. Real values use finite
decimal text; null remains unknown.
HOW
Source expression: V_pred(t+h) = V_t + h*dV_dt. Current Bangel expression: voltage + horizon *
voltage_rate. Require every input to be known. Require horizon >= 0.0.
THEN
Emit the scoped calculation result. Missing inputs produce their specific PINK_MISSING_* HOLD; failed profile
checks produce PINK_DOMAIN. A false numeric predicate can occur in a PASS calculation receipt; it is not
permission.
CURRENT EVIDENCE
Fixture inputs {"voltage": "12", "horizon": "2", "voltage_rate": "-1"}; expected 10. Result matched through
Bangel, admitted JP, the Bangel API, with validated receipt outputs. 3 missing-input cases and 1 supplied
domain cases passed.
SOURCE DIMENSION
voltage
REMAINING REQUIREMENT
Complete the source-defined measurement/evidence contract, units and calibration bindings. Native C# and Hagar formula-ID
bindings remain unverified in this rerun.
SOURCE REFERENCES
D017 pp. 4,11
Evidence: evidence/rerun/pink/F-153.json

Publication is pending owner review. White papers are excluded.

NO COMMERCIAL OR PUBLIC USE PERMITTED